本文へスキップします。

【全・企英・PC】ヘッドリンク
  • S
  • M
  • L
【全・企英・PC】ヘッド検索フォーム
Site search
【全・企英】メガメニュー
【全・企英・SP】ヘッドリンク
【全・企英・SP】ヘッド検索フォーム
Site Search
【参・企英・ガバナンス】カテゴリタイトル

governance

ページタイトル

BCP

コンテンツ

We identify risks to be addressed in a Group-wide manner as Group-wide risks and operating line risks. We address such risks by specifying a division in charge of managing major risks and a supporting division.

Above all, to ensure a prompt initial response to emergencies, we have established a system for reporting and collecting information around the clock.

In the event of a serious incident to be addressed by the overall Group, we establish the Group emergency headquarters to confirm the safety of employees, check the damage suffered, and take prompt measures to continue supplying products to our customers. In addition, we constantly review and improve our crisis response system through training on the establishment of Group emergency headquarters and the inspection and maintenance of necessary facilities, equipment, and other items, in our efforts to maintain and improve our initial response capability.

For handling business continuity risks, such as natural disasters and troubles, we implement business continuity management (BCM) by having each COMPANY formulate a business continuity plan (BCP) and review it as necessary.
We have also established the Group Disaster Control Office as a permanent organization and formulated rules on the reporting of disaster and trouble information, thereby establishing a system for obtaining the latest information promptly. We also share information about the causes of fires and other information beyond boundaries between COMPANYs in our efforts to disseminate measures to prevent their recurrence throughout the Group.


In Japan, we have introduced a safety confirmation system for Group employees. Using this system, safety confirmation is carried out promptly at the headquarters and each business location in the event of a disaster or accident.
We conduct nationwide safety confirmation training twice a year, thereby maintaining a system that places maximum priority on human life. In addition, a comprehensive disaster drill is conducted regularly at each business location.
With regard to seismic protection, the Group is taking measures by conducting earthquake resistance surveys.

  • Tsunami Countermeasures
    To prepare for tsunami, the Group has obtained inundation hazard maps from local governments and identified and secured safe areas inside buildings (by indicating altitudes, evacuation areas, and other information).
  • Fire Countermeasures
    Voluntary inspections are conducted at each business site and disaster control inspections are conducted as preventive initiatives.
  • Emergency Supplies
    Water, food, and other items are stockpiled at each business site in preparation for emergencies.